Maersk will fit a 35 meter rotor sail from Anemoi Marine Technologies to one of its container ships in mid-2027, the first installation of its kind on a container vessel.
DR reports in its weekly business feature Millioner Milliarder that A.P. Moller-Maersk has signed an agreement with the British company Anemoi Marine Technologies. The deal covers the delivery and mounting of a single sail on one Maersk ship, according to DR, which cites a press release from the company.
The sail is a so-called rotor sail, measuring 5 meters in diameter and 35 meters high. It will be placed at the bow of the vessel. When the cylinder rotates, the wind creates a pressure difference that pulls the ship forward.
Per Anemoi, the vessel is an 8,700 TEU ship of Maersk’s Lima class. The company states that it will design, manufacture and deliver the unit itself. The installation is scheduled for the middle of 2027.
As noted by Anemoi, the sail will not be tested on a dedicated trial route. Instead, it will be assessed during the ship’s regular voyages in the North and South Atlantic. The setup is described as a pilot test of wind assisted propulsion.
DR reports that the sail can potentially save up to one ton of fuel per day. Anemoi states that a single rotor sail can cut carbon dioxide emissions by roughly three tons daily. The purpose of the project is to reduce fuel consumption on the vessel.
Technology from the 1920s
Rotor sails are not a new invention. As reported by DR, the underlying physics was described by a German physicist in the middle of the 1800s. The technology itself first appeared around 100 years ago.
The German engineer Anton Flettner was the first to build a ship with rotating cylindrical sails. What is new in the Maersk project is the vessel type. It is the first time the sails are mounted on container ships.
The technology is already in use in Danish waters. DR notes that Scandlines installed its first rotor sail in 2020 on the ferry route between Denmark and Germany. The company’s ferries now carry two of the sails.
Maersk has not announced further installations beyond the single unit covered by the agreement. The company’s press release describes the project as an initial step. Results from the Atlantic voyages will follow the 2027 installation.







